The Hub Radcliffe opens to the public at 2.30pm on Saturday 5 December, with free swims, gym tasters and tours. Booking opens on Saturday 28 November.

The Hub Radcliffe, the town’s new leisure centre and library, opens to the public at 2.30pm on Saturday 5 December. Swims, gym inductions, fitness tasters, Clip ‘n Climb sessions and tours will all be free that afternoon.

Bury Council announced the date in a press release on 26 November. The building on Blackburn Street took three years to build. It brings the swimming pools, the gym and the town’s library together under one roof.

How to get a place on launch day

The launch runs from 2.30pm to 6pm, according to Bury Leisure’s launch day page. Every taster and tour is free, but Bury Leisure asks people to book ahead.

  • Booking opens on Saturday 28 November on the Bury Leisure website.
  • You can book a tour of the building or one of the free activities.

The free sessions on the day are:

  • swims in the 25-metre main pool and the learner pool, with demonstrations of the accessibility pool pods
  • gym inductions and equipment demonstrations in the 100-station gym
  • fitness tasters in the two new exercise studios
  • wellbeing tasters
  • Clip ‘n Climb taster sessions
  • talks in the library and storytelling and rhyme sessions in the children’s library
  • guided tours, including the pool viewing gallery, the rooftop activity space and the café

A formal opening ceremony for invited guests comes first. The Mayor of Bury, Councillor Tahir Rafiq, is due to cut the ribbon at 1.40pm, the council said. Children from Chapelfield Primary, Wesley Methodist Primary and St John’s CE Primary will sing a song they wrote for the building, called “A Perfect Place”.

Two women in hard hats and high-visibility vests hold a hose filling the 25-metre pool at The Hub Radcliffe
Councillor Charlotte Morris (left) and Lynne Ridsdale, chief executive of Bury Council, putting the last water into the main pool at The Hub during the summer. Photo: supplied by Bury Council

What is inside

Bury Leisure’s page for the centre lists:

Facility Detail
Main pool 25m by 13m, six lanes
Learner pool 15m by 10m, with a moveable floor
Pool pods Two, for independent access to both pools
Spectator seating Up to 150 people, poolside
Gym 100 stations
Studios Two large fitness class studios
Wellness Four consultation rooms
Clip ‘n Climb Indoor climbing walls
Other Meeting rooms, an open-air rooftop activity space, a ground floor café

The library has a separate children’s library and a larger main library, plus a community learning space, the council said.

Opening hours

Once open, the leisure centre will run these hours, according to Bury Leisure:

Day Hours
Monday to Friday 6.15am to 10pm
Saturday 8am to 7pm
Sunday 8am to 7.30pm

Clip ‘n Climb has its own times. In term time it runs Wednesday to Friday from 4pm to 8pm, and Saturday and Sunday from 9am to 6.30pm. Each session lasts 90 minutes.

Library opening hours have not been published yet. The council’s Radcliffe Library page still describes the old Stand Lane library as closed for the move.

What it means for you

  • If you used Radcliffe Library, books borrowed from Stand Lane after 12 September can go back to The Hub once it is open. The council has charged no overdue fines on Radcliffe items during the closure. We covered the Stand Lane closure in October.
  • If you swim, the main pool has six lanes and the learner pool floor can be raised or lowered.
  • Getting there: The Hub is a short walk from Radcliffe Metrolink stop and Radcliffe bus station. Buses 98, 512, 524, 886, 890, 895 and 896 stop nearby, Bury Leisure says.
  • Parking: Bury Leisure says free council car parks are a short walk away. At busy times it points drivers to the Civic Suite East and West car parks if the Blackburn Street car park is full.

Part of a wider plan for the town

The council says The Hub is one of several Radcliffe projects. The others it lists are:

  • Radcliffe Star Academy, the new secondary school
  • Graft, an enterprise centre in the former library building on Stand Lane
  • new homes on Green Street, including priority housing for care leavers
  • Market Chambers, being turned into space for community groups, offices and shops

Councillor Charlotte Morris, cabinet member for regeneration and growth, said: “The Hub is a major investment, but the building itself isn’t the outcome. What matters is what people can do here: swim, exercise, learn, use the library, access services.”

She added: “Bringing those things together also brings people back into the town centre. That’s important for the Hub, but it’s important for the market, businesses and the wider town centre too.”